
会社のニュース | | | | | | | | コモンモードチョーク | | | | | | | | 業界ニュース | | | | | | | | 変成器| | | | | | | |RJ45 connectors
短絡により、 220v 変成器s often require a long time to maintain. In order to prevent the high-frequency 変成器 from getting wet, two measures can be taken:
(1) Before the end of work, buckle the cover of the high-frequency 変成器, evacuate the high-frequency 変成器 with a vacuum pump, remove the free water on the surface of the high-frequency 変成器 body, and remove the vacuum with dry nitrogen or dry air when working the next day. Generally, high-frequency 変成器s can be put into operation directly after 24 hours of hot oil circulation after maintenance.
(2) Do a good job of rainproof measures for high-frequency 変成器s after work every day, and dry the high-frequency 変成器/customied 変成器 すべての作業が完了した後、ホット オイル スプレーで通常 7 ~ 10 日かかります。
短絡により、 220v 変成器s often require a long time to maintain. In order to prevent the high-frequency 変成器 from getting wet, two measures can be taken:
(1) Before the end of work, buckle the cover of the high-frequency 変成器, evacuate the high-frequency 変成器 with a vacuum pump, remove the free water on the surface of the high-frequency 変成器 body, and remove the vacuum with dry nitrogen or dry air when working the next day. Generally, high-frequency 変成器s can be put into operation directly after 24 hours of hot oil circulation after maintenance.
(2) Do a good job of rainproof measures for high-frequency 変成器s after work every day, and dry the high-frequency 変成器/customied 変成器 すべての作業が完了した後、ホット オイル スプレーで通常 7 ~ 10 日かかります。
English
Pусский
Deutsch
Français
Portugues
Español
العربية
lingua italiana
한국어
Türk dili

